PMConsulting.ca — Build Dashboard

1,590-Page Site Rebuild — 6-Pillar Zero Lead Loss System
Last updated: April 28, 2026 — 485 pages live on production
485
Pages Built
1,105
Remaining
30.5%
Complete (485 / 1,590)
14
Build Days
485
Pages Built
1,105
Remaining
~124
Days at FAQ Drip Rate

Phase 1: Foundation

46 / 46
Core pages, hubs, pillar hubs, calculators, and technical files all live. _redirects N/A on Bunny CDN (Edge Rules instead).

Phase 2: Content Depth

~441 / 508
Blog (170), pillar clusters (49 done), industries (16 + 20 service x industry matrix), locations (12), topic clusters (contractor-marketing 40, AI 32, SEO 23, CRM 10, web-design 8, and more). Remaining: 28 service x industry matrix, 80 industry x location, case studies (15), resources (8)

Phase 3: FAQ Drip

0 / 1,236
1,236 FAQ standalone pages. Not started. Target: 10/day via automated drip.

Section Breakdown — 485 Pages Built

Blog Posts 170 + hub = 171

  • /blog/ Hub (170 posts)
  • 170 blog posts published. View all at /blog/

Other Small Clusters ~20

Technical Files 7 live, 1 N/A

  • /robots.txt
  • /sitemap.xml
  • /sitemap.html
  • /llms.txt
  • /llms-full.txt
  • /favicon.ico
  • /apple-touch-icon.png
  • N/A/_redirects (Bunny CDN — uses Edge Rules)

What's Remaining (~1,105 pages)

Recent Activity

2026-04-28
Phase 1 closed at 46/46. Verified all four "missing" technical files are actually live: /llms-full.txt, /favicon.ico, /apple-touch-icon.png all return 200. /_redirects marked N/A — pmconsulting.ca is on Bunny CDN, redirects handled via Edge Rules.
2026-04-28
Dashboard refreshed: 485 pages confirmed live on Bunny CDN + Netlify (deploy 2026-04-13). Repo migrated out of iCloud to ~/Projects/pmconsulting-ca-dashboard. Phase 2 reconciled at ~441/508 (87% complete).
2026-04-13
Full Bunny CDN sync (497 files, 0 failures) + Netlify deploy. Added 20 service x industry matrix pages: Smart Website x 8 industries, Database Reactivation x 8 industries, Reviews AI x 4 industries (plumbers, hvac, electricians, roofers). Site total: 485 pages live.
2026-04-06
412 pages verified on disk. Updated llms.txt, sitemap.xml, sitemap.html, progress tracker. Blog: 170 posts. All 14 calculators complete. 12 location pages live. Topic clusters built: contractor-marketing (40), AI (32), SEO (23), CRM (10), web-design (8).
2026-03-27
Built 5 tool calculator pages (Revenue Gap, ROI, Cost of Doing Nothing, Hire vs Automate, Missed Calls). Built Results page with database reactivation case study. Built Portfolio page with 15 live website screenshots. Rebuilt About page hero (photo left, writeup right).
2026-03-27
Built FAQs hub (16 FAQs across 4 categories). Built Resources hub (8-card resource grid). Built Locations hub (12 Ontario cities, 8 provinces). Built Privacy Policy and Terms of Service.
2026-03-27
Built Kitchen & Bath industry page. Built AI Systems page (Claude Code showcase). Built HTML Sitemap. Deployed robots.txt, sitemap.xml, llms.txt.
2026-03-27
Tightened meta tags on 8 key pages. Standardized founder facts across 4 pages. Added source citations to statistics on 5 pages. Homepage performance fixes (CLS, font loading). Updated homepage hero stat to $750,000+.
2026-03-26
192 pages reported live. Industry verticals (8 Tier 1) deployed. Blog hub live. Pricing page live.
2026-03-25
All 6 pillar hub pages deployed and live. System pages (The Problem, Zero Lead Loss) deployed. Core pages (Homepage, About, Contact, How It Works, AI Lead Audit) deployed.
2026-03-23
Project initialized. Architecture finalized (1,590+ pages). Playbook, tracker, and dashboard created. H1 locked: "The Contractor Marketing Engine". Brand: PM Consulting Inc.

Quick Links

Session Quick-Start

"Let's work on pmconsulting.ca"
Read: ~/.claude/playbooks/pmconsulting-site-build.md
Read: ~/.claude/tracking/pmconsulting-progress.yaml
Read: ~/Downloads/Local-SEO-Site-Generator-Capabilities-Deep-Dive.docx.md

PM Consulting Inc. | PMConsulting.ca Build Dashboard

Updated April 28, 2026. 485 pages live on production across all sections.